Construction of a new sewage system with a total length of 3.8 km including house connections and discharge from the newly built pumping station to the WWTP. The WWTP is constructed as a monoblock of monolithic reinforced concrete tanks and a reinforced concrete service building with a flat roof.
The wastewater treatment plant is designed as a mechanical-biological plant, with a completely mixed activated sludge system with simultaneous nitrification and denitrification for the PE of 500.
Financial volume
approx. 100 million CZK
Implementation
2025