Dolní Morava – Sewer Lines and Wastewater Treatment Plant

Water management and ecological constructions

Description of the building

The project involved the construction of a new sewer line network, including sewer connections, related structures and road repairs in the municipality of Dolní Morava.

The sewer system was made of PP DN 250 plastic pipes with a total length of 8 518 m, including concrete and plastic manholes. The contract also included the supply and installation of a DN 2500 pumping station and measuring structures with a Parshall flume. Likewise, the project included sewer connections of various dimensions and a water connection for the newly built wastewater treatment plant.

After completion of the underground work, the asphalt surfaces of the roads were renovated over a total area of 9 422 m². A technically difficult part of the project was the construction of underpasses under the watercourse using seamless steel pipes.

All work was carried out professionally and to the required quality. The project was completed and handed over to the client within the contractually agreed deadline.


Financial volume

203,8 million CZK

Implementation

2025

Connect with us and turn your projects into reality.