Description of the building
The project involved the construction of a new sewer line network, including sewer connections, related structures and road repairs in the municipality of Dolní Morava.
The sewer system was made of PP DN 250 plastic pipes with a total length of 8 518 m, including concrete and plastic manholes. The contract also included the supply and installation of a DN 2500 pumping station and measuring structures with a Parshall flume. Likewise, the project included sewer connections of various dimensions and a water connection for the newly built wastewater treatment plant.
After completion of the underground work, the asphalt surfaces of the roads were renovated over a total area of 9 422 m². A technically difficult part of the project was the construction of underpasses under the watercourse using seamless steel pipes.