Road no. III/37418, 37417 in Podolí - through road and bridge
Execution:
2018
Built-up area / financial costs:
c. 11 Mio CZK
Project description:
Reconstruction of through road no. III/37418 in the length of 484 m, total reconstruction of following road in the length of 125 m, incl. bridge across the stream, adjacent abutment wall and stairway.
Photos: